Converting the Attic

Having decorated the first floor bedrooms, we moved on to convert the attic to a third bedroom in the late autumn 2008.  It took us until spring 2010 to complete this work due to the time available to us.  We installed an ensuite shower room and toilet.  The window needed replacing and a new Velux window was installed.  The floor was sanded and treated.