|
Converting the Attic
Having decorated the first floor bedrooms, we moved on to convert the attic
to a third bedroom in the late autumn 2008. It took us until spring 2010
to complete this work due to the time available to us. We installed an ensuite
shower room and toilet. The window needed replacing and a new Velux window
was installed. The floor was sanded and treated.
|