Fitting a New Kitchen

Work has progressed over the time with the kitchen.  Initially, it had a rotten wooden floor, which we had removed and a new concrete floor laid by a local builder.  Then we begun assembling the flat-pack kitchen from the UK and installed the 800mm cooker we had bought off Ebay.  With a new back door and window installed, new ceiling and tiled floor, the kitchen was unrecognisable from the original room.  Only the low stone sink and one corner cupboard remain.